Permittable is now Permavia. Read about our new name

Pay for the reports you need, sized to your project

Three standalone reports, each a flat rate set automatically by your project's gross square footage. No subscriptions, no bundles — and you only pay after you see your analysis.

estimate your cost

how it works

Priced after the analysis, not before

No upfront tier selection and no manual square-footage entry to get wrong. You see your price once we've measured the actual scope of your plans.

  1. 01

    Upload & select

    Drop in your residential application package (PDFs) and toggle which of the three reports you want. No tier to pick, no payment up front.

  2. 02

    We analyze & size it

    The Permavia engine run-checks your package against local code and automatically computes your project's exact gross square footage.

  3. 03

    Unlock your report

    We map your detected GSF to the right price tier and show your invoice. Pay to unlock the full report and its 3-run pack.

three standalone reports

Buy only what your project calls for

Each report can be used as a standalone solution and includes a pack of 3 analysis runs, so you can run, correct, and re-verify without friction at every step of the compliance loop.

Intake Completeness Check

portal-ready packet audit

Ensure every required form, plan, and supporting document in your permit application packet is present and complete. Does not check for precision of calculations and annotations.

from$100/ 3-run pack
see your price
recommended

Permit Review Diagnostic

deep code-compliance engine

Compare your permit application package to all your jurisdiction's relevant codes. Our AI identifies code violations, inconsistencies, and compliance issues providing instant redlines to ensure your application package meets technical standards the first time.

from$200/ 3-run pack
see your price

Permit Optimization Analysis

cost + complexity reduction

Identify redundant, non-required, and risk-inducing details in your permit application package that will slow approval and reduce construction flexibility. Ensures only relevant information reaches reviewers.

from$100/ 3-run pack
see your price

Every purchase is a 3-run pack. Need more iterations? Add another 3-run pack on the same report at the same tier rate.

estimate your cost

See your price at any project size

On a live project we detect this for you. Here, drag to your project's applicable gross square footage — the area of your new build or remodel scope, not the whole building.

Applicable GSF
sq ft
10012,000+
Standard Residential501 – 2,500 sq ft
Intake Completeness Check
$150
3-run pack
Permit Review Diagnostic
$500
3-run pack
Permit Optimization Analysis
$150
3-run pack

Estimates in USD. Each report is billed as a standalone 3-run pack; final billing reflects the actual applicable GSF detected from your plans.

Full pricing matrixflat rate per 3-run pack · USD
Project scaleIntake Completeness CheckPermit Review DiagnosticPermit Optimization Analysis
Small RemodelUp to 500 sq ft$100$200$100
Standard Residential501 – 2,500 sq ftyour project$150$500$150
Large / Custom2,501 – 5,000 sq ft$300$1,000$300
Luxury Estates5,001 – 8,000 sq ft$550$1,800$550
Multi-Unit / Large Custom8,001 sq ft +$550+ $0.08 / sq ft over 8k$1,800+ $0.25 / sq ft over 8k$550+ $0.08 / sq ft over 8k

Multi-Unit / Large Custom is the Luxury Estates base price plus a per-square-foot rate applied only to footage above 8,000 sq ft.

Our 100% guarantee: don't believe you got great value? We'll give a 100% refund. No questions asked. Learn more about the Permavia 100% guarantee

the fine print, in plain terms

How packs & runs work

What counts as a run

A run is one full analysis of a specific plan-set version. Re-uploading a modified set to address violations is a new run. Each pack includes 3; buy another 3-run pack on the same report to keep going.

One dwelling per tier

The flat-rate tiers cover a single primary single-family dwelling. Duplexes, townhomes, or detached ADUs can't share one flat-rate tier — run them as separate projects or use the Multi-Unit / Large Custom GSF rate.

One design per submission

Each package must represent a single, definitive design. Application packages carrying alternative layouts (“Option A” vs “Option B”) may be rejected. Split them into separate submissions for best results.

10% geometric variance

Runs in a pack stay valid while the footprint and GSF remain within 10% of the first run. A comprehensive redesign, added story, or altered footprint is flagged as new scope and needs a fresh pack at the right tier.

Running a high volume of projects, or a portfolio above 8,000 sq ft per build? Talk to our team about enterprise pricing.

Pricing FAQ

How is Permavia's pricing calculated?

Each report is a flat rate set by your project's gross square footage (GSF), the area of your new build or remodel scope, not the whole building. Permavia uses five GSF tiers: Small Remodel (up to 500 sq ft), Standard Residential, Large / Custom, Luxury Estates (up to 8,000 sq ft), and Multi-Unit / Large Custom for anything larger. Every report has a fixed price within each tier, so there is no per-square-foot math to get wrong.

Do I pay before or after the analysis?

After. You upload your application package and choose which reports you want with no tier to pick and no payment up front. Permavia analyzes your plans, automatically detects the exact applicable GSF, and shows your price. You only pay to unlock the full report and its 3-run pack.

Can I buy a single report, or do I have to bundle them?

Every report is standalone. Permavia no longer sells bundles: buy only the Intake Completeness Check, Permit Review Diagnostic, or Permit Optimization Analysis your project needs, each as its own 3-run pack at the same GSF tier rate.

What is a run, and what is a 3-run pack?

A run is one full analysis of a specific plan-set version. Re-uploading a revised set to clear violations counts as a new run. Every report purchase includes a pack of 3 runs so you can run, correct, and re-verify without friction. Need more iterations? Add another 3-run pack on the same report at the same tier rate.

What is the lowest price, and how are large projects handled?

The smallest tier, Small Remodel (up to 500 sq ft), starts at $100 per 3-run pack for the Intake Completeness Check or Permit Optimization Analysis and $200 for the Permit Review Diagnostic. Projects above 8,000 sq ft use the Multi-Unit / Large Custom tier: the Luxury Estates base price plus a per-square-foot rate applied only to the footage above 8,000 sq ft.

Do you offer volume or enterprise pricing?

Yes. If you run a high volume of projects, or a portfolio with builds above 8,000 sq ft, contact the Permavia team for enterprise pricing tailored to your portfolio.

Comparing options? See why Permavia wins.

Ready to streamline your next permit?

Create a free account, upload your plans, and get AI-powered insights in minutes.