Permavia vs. PlanCheckPro
Permavia and PlanCheckPro both use AI to catch plan issues before a building department does. The difference is emphasis: Permavia centers on a code-cited, readiness-scored pre-submittal diagnostic (with intake-completeness and optimization), while PlanCheckPro positions itself around multi-discipline AI plan review.
Side-by-side comparison
Based on publicly available information as of 2026. Capabilities change quickly — verify current details with each vendor.
Pre-submittal permit readiness for applicants, plus tools for cities.
AI plan review across architectural, structural, MEP, and plumbing drawings.
Permit Review Diagnostic with exact code citations and a readiness score (e.g. "87% ready").
AI plan-review findings across disciplines in a single analysis.
Traceability (exact code section per issue) + intake completeness + optimization.
Fast, multi-discipline drawing review before submission.
Code Scout — free AI concierge for building & zoning questions.
Varies — check current offering.
What sets Permavia apart
Both tools aim to reduce correction cycles by catching issues early. Permavia's emphasis is traceability and readiness: every flagged issue cites the exact code section, and the package gets a readiness score that tells you how close it is to a clean first submission.
It also pairs review with an intake-completeness check and an optimization pass that trims documentation reviewers don't need — depth a single plan-review pass doesn't match. Run your own drawing sets through Permavia and see how much closer to first-pass ready it gets you.
How to choose
Demand first-pass readiness
The goal isn't a slicker workflow — it's approval on the first submission. Judge every tool by whether it actually tells you you're ready to submit. Permavia is built around exactly that.
Require code-cited traceability
A flag you can't trace is a flag you can't act on. Permavia cites the exact code section for every issue — fast to fix, and defensible when a reviewer pushes back.
Check real local coverage
Codes and local amendments vary by jurisdiction. Permavia covers building, fire, and zoning — the rules that actually get projects bounced.
Permavia vs. PlanCheckPro: FAQ
What is the difference between Permavia and PlanCheckPro?
Both are AI plan-review tools that catch issues before a building department does. Permavia centers on a pre-submittal Permit Review Diagnostic with exact code citations and a readiness score, plus intake completeness and optimization, and also serves cities. PlanCheckPro positions itself as AI plan review across architectural, structural, MEP, and plumbing drawings in a single analysis.
Do both tools review all disciplines?
Both analyze multi-discipline drawing sets. Permavia emphasizes traceability — citing the exact code section for each flagged issue — and a readiness score that tells you how close a package is to a clean first submission.
Can I see a sample before buying?
Yes. You can request a sample Permit Review Diagnostic to see how Permavia surfaces issues before submission, and try Code Scout for free.
Which should I choose?
Test both against your jurisdiction and drawing sets. If code-cited, readiness-scored pre-submittal review is the priority, Permavia is built for that; compare against PlanCheckPro's analysis on your own plans.
Run your plans through the Permit Review Diagnostic
Get a clear, code-cited path to first-pass approval.